The Frederick Douglas Centre, Newcastle University

Client

Newcastle University

Sector

Commercial, Education

Close

Get in Touch

Want to know what we can do for you? Please use this form to contact our team.

This field is for validation purposes and should be left unchanged.

Or contact us directly

UCS Icons01642 242567

UCS Iconsinfo@ucs-technologies.com

Client Background

Newcastle University is a higher education establishment providing courses including but not limited to science, business and media. The creation of the 24 acre Helix Campus meant there was plenty of new space for the university to develop and expand their teaching and learning resources. The £35 million Teaching & Learning Centre was re-named the Frederick Douglas Centre in honour of the 19th-century anti-slavery campaigner.

The Challenge

The Frederick Douglas Centre has four floors and a total of 1121 ports and the building features a 750-seat auditorium with an unusual curvature. The design of the auditorium had to be considered when producing the plans for the cabling, ensuring a high-quality installation. Auditorium Auditorium interior

What UCS Technologies Did

UCS Technologies were able to provide a turnkey solution for the Data Comms infrastructure. Not only is UCS a key partner to Newcastle University, but has extensive knowledge of the campus, that enabled the main contractor to deliver site-wide connectivity and tier 1 solution for the project.

The Technical Solution

UCS installed a total of 5 comms rooms. One dedicated to each floor and then an additional ‘satellite’ comms room was added on level 1. Each comms room is linked with dual single-mode fibre optic backbone cables in a ring topology. External single-mode fibre optic cables are installed from existing campus buildings to the ground floor and third floor. Each comms room is also linked with a 50 pr telephone cable from the ground floor in a star topology. External 100 pr telephone cable is installed from existing campus buildings to the ground floor building distribution panels. Individual cat6a cables were installed to the relevant comms rooms on each floor for distribution of services. Cat 6a cables were installed for each location as defined by the client's Wi-Fi survey design, UCS undertook the installation of the client issued access points to each location.

Key Features

  • Cat 6a F/UTP Cabling (with B2CA cable)
  • 48 core OS2 single-mode internal fibre optic backbone
  • 48 core OS2 single-mode external fibre optic backbone
  • 50 pr internal telephone backbone cables
  • 100 pr external telephone backbone cables
  • Eaton access range comms cabinet
  • 25-year Connectix warranty

The Outcome

“Liaison between Connectix and the installation partner UCS Technologies was seamless and helped to enable successful building completion and opening date commitments. The installation itself was of a very high standard and Connectix conducted a post site installation survey to confirm the quality of the install and that it was in accordance with their installation guidelines.” Andrew Fisher, Newcastle University, Telecoms & Cabling Manager.

Get in Touch

Want to know what we can do for you? Please use this form to contact our team.

This field is for validation purposes and should be left unchanged.

Case Studies

How UCS Technologies future proofed Brentford FCs Academy’s network infrastructure

Brentford Football Club’s Training Academy required a robust and future-proofed network infrastructure to support the club's growing technological needs. Working in collaboration with Portakabin, UCS Technologies was selected to deliver a comprehensive Cat 6a B2ca network system within a tight timeframe.

View

PD Ports: An ever changing landscape

PD Ports Teesside is one of the main logistical hubs for the importing and exporting of goods in the north-east of England and one of the largest in the country.

View

Moderna’s new £25m Biomarker Laboratory

Merit Health was established in 2002, with the aim of providing off site construction method that enhances design, efficiency of installation, health & safety and build methodologies.

View