Client Background

Newcastle University is a higher education establishment providing courses including but not limited to science, business and media. The creation of the 24 -acre Helix Campus meant there was plenty of new space for the university to develop and expand their teaching and learning resources. The Catalyst building was a result of the £350 million development plan of the Newcastle Helix. The building was to provide research and professional spaces to further relationships between various sectors and students.

The Challenge

The building featured 5 floors each with their own dedicated comms room. Each resource provided needed to be supported by the solution including office space, meeting rooms, collaborative learning spaces and board rooms.

What UCS Technologies Did

UCS Technologies were able to engage with the M&E Contractor and deliver a fast paced project installing on multiple work faces. To meet the tight timescales that where required by the university

The Technical Solution

A total of 6 comms rooms were created in the building, one dedicated to each floor. Each comms room is linked with dual single-mode and multi-mode fibre optic backbone cables diversely routed in a star topology. External single-mode fibre optic cables are installed from two existing campus buildings to the lower ground floor comms room. Each comms room is linked with a 50 pr telephone cable from the lower ground floor building distribution panel in a star topology. Individual cat6a cables were installed to the relevant comms room on each floor for distribution services. Cat6a cables were installed as defined by the client's wi-fi survey design. UCS Technologies undertook the installation of the client issued access points.

Key Features

  • Cat 6a F/UTP Cabling (with B2CA cable)
  • 48 core OS2 single-mode internal fibre optic backbone
  • 48 core OS2 single-mode external fibre optic backbone
  • 50 pr internal telephone backbone cables
  • 100 pr external telephone backbone cables
  • Eaton access range comms cabinet
  • 25-year Connectix warranty

The Outcome

“Liaison between Connectix and the installation partner UCS Technologies was seamless and helped to enable successful building completion and opening date commitments. The installation itself was of a very high standard and Connectix conducted a post site installation survey to confirm the quality of the install and that it was in accordance with their installation guidelines.” Andrew Fisher, Newcastle University, Telecoms & Cabling Manager.

Get in Touch

Want to know what we can do for you? Please use this form to contact our team.

This field is for validation purposes and should be left unchanged.

Case Studies

How UCS Technologies future proofed Brentford FCs Academy’s network infrastructure

Brentford Football Club’s Training Academy required a robust and future-proofed network infrastructure to support the club's growing technological needs. Working in collaboration with Portakabin, UCS Technologies was selected to deliver a comprehensive Cat 6a B2ca network system within a tight timeframe.

View

PD Ports: An ever changing landscape

PD Ports Teesside is one of the main logistical hubs for the importing and exporting of goods in the north-east of England and one of the largest in the country.

View

Moderna’s new £25m Biomarker Laboratory

Merit Health was established in 2002, with the aim of providing off site construction method that enhances design, efficiency of installation, health & safety and build methodologies.

View