Client Background

UCS Technologies worked alongside the UK’s largest provider of turnkey solutions, delivering portable & permanent buildings for use across all sectors. As part of the nuclear division, a contract was awarded for delivering client project offices and site facilities. UCS Technologies were tasked with delivering stage one of the project's implementation.

The Challenge

UCS had to undertake the installation of a completely secure and physical ICT infrastructure throughout the project offices and associated buildings. This was completed by working alongside other trades under controlled working practices within a short time frame. In partnership with the client, it was essential to create a robust ICT infrastructure that utilised enhanced segregation methods that met the security needs of the client. It also provided a network that services the Hinkley Point management team.

What UCS Technologies Did

With a clear understanding of the client’s brief, UCS were engaged from an early point in the project to ensure all staff were properly vetted and security processed. Engineers were assigned to the project in advance of site commencement. To meet the client’s six-week timescale, UCS Technologies ensured sufficient resource was allocated to the project. It was critical to ensure a seamless transition as the client was looking to occupy the building ahead of the proposed construction phase.

The Technical Solution

The solution installed included a category 6 UTP cabling system that was installed throughout the project offices. This system offered connectivity with dual resilience. The new building featured low-level outlets for PCs, printers and IP telephones. High-level outlets were also installed for Wi-Fi access points and projectors.

Key Features

  • Category 6 UTP outlets
  • 80Gbps inter-switch backbone
  • 1Gbps to the desk
  • AV Projection

The Outcome

The new project offices now have a reliable, secure network that operates at peak performance.

Get in Touch

Want to know what we can do for you? Please use this form to contact our team.

This field is for validation purposes and should be left unchanged.

Case Studies

How UCS Technologies future proofed Brentford FCs Academy’s network infrastructure

Brentford Football Club’s Training Academy required a robust and future-proofed network infrastructure to support the club's growing technological needs. Working in collaboration with Portakabin, UCS Technologies was selected to deliver a comprehensive Cat 6a B2ca network system within a tight timeframe.

View

PD Ports: An ever changing landscape

PD Ports Teesside is one of the main logistical hubs for the importing and exporting of goods in the north-east of England and one of the largest in the country.

View

Moderna’s new £25m Biomarker Laboratory

Merit Health was established in 2002, with the aim of providing off site construction method that enhances design, efficiency of installation, health & safety and build methodologies.

View